Home Up Feedback Contents Search

GASPAL

 

 

 

GasPal


Management System for Production and Storage Operations

 a development of MARACO, Inc. 

GasPal is the latest development of MARACO and has been designed to work in conjunction with the GASTOP and GMAN applications.  The goals of this new application are:

bullet

 Accurate prediction of performance of gas storage reservoir/compressor/pipeline systems with a speed that allows hourly/daily scheduling of compressors for production and injection. Schedules obtained are efficient and economic.

bullet

Given a complete database GasPal allows operations to be quickly rescheduled in response to new opportunities or unexpected changes in available equipment and/or supply/demand requirements.

bullet

GasPal, focusing on operational planning, is a logical counterpart to Maraco’s GasTop software, which performs optimal investment planning for storage operations.

bullet

The first initial release is targeted for the first quarter of 2005.

 

  GasPal Characteristics  

bulletGasPal: foundation is a PC-based gas reservoir simulator.
bulletGasPal: complex surface network may include splits, loops and multiple offtake points.
bulletGasPal: each of several reservoirs may have up to 5 producing layers
bulletGasPal: GRIDDER™ preprocessor inserts arbitrary number of computing cells into each reservoir.
bulletGasPal: simulates injection and production or a mixture of the two,      providing full storage scheduling flexibility.
bulletGasPal: hourly, daily or monthly time steps accommodate  short-, mid- and long-term planning needs.
bulletGasPal: optimizes service allocation and size of possible compressor configurations.

 

Operational Planning Scope 

Short-term operation: hourly time steps for two-week intervals, which will benefit immediate injection and withdrawal planning.

Mid-term planning: daily time step for one year, which will enhance overall storage planning.

Long-term production: monthly time step for 30 years, which will be useful for regular gas reservoir production or blowdown.

 

A Graphical Overview of the GasPal Application

Figure 1 - Surface Flow Capabilities: Splits, Loops and Offtake Points

Figure 2 - Surface Line Capabilities: Multiple Reservoirs

Figure 3 - Surface Line Capabilities: Compressor Optimization

Figure 4 - Reservoir: Arbitrary Number of Simulation Cells

Figure 5 - Multiple Layers

To see a more detailed description of GRIDDER, go to the GMAN page on this website, or click here.

 

Interface Layout

The following screens display a selection of the graphical results output produced by GasPal.

Figure 6 - Basic Interface Layout

Figure 7 - Reservoir Pressure Profiles

Figure 8 - Flow Rate Through Each Pipe

Figure 9 - Pressure Drop Across Each Pipe

Figure 10 - Offtake Rate: Fixed Back Pressure

Figure 11 - Pressure: With Offtake Rate Fixed

Figure 12 - Reverse Flow

 

If you would like the above information in a PowerPoint Slide Show format, right click here and save the file.

 

 

 

Information Request Form

If you would like more information on GasPal, fill in the boxes and submit this form.

Send product literature
Have a salesperson contact me

Name
Title
Company
Address
E-mail
Phone

 

Hit Counter

Home ] Up ]

Send mail to webmaster@etechint.co.uk with questions or comments about this web site.
Copyright © 2004 ETECH International Limited
Last modified: June 08, 2005